Navigation Menu New

Access My Account, Order History, Lists and more here.

4EUC4 A52EA12 UNSPSC # 39121202

PVC Conduit: Schedule 40, 4 in Trade Size, 10 ft Nominal Lg

  • Item # 4EUC4
  • Mfr. Model # A52EA12
  • UNSPSC # 39121202
  • Catalog Page # 320 320
Country of Origin USA. Country of Origin is subject to change.

CANTEX Schedule 40 Conduit is engineered with PVC to resist rust and corrosion in underground applications. The belled end design helps promote easy installation and eliminates the need for special coupling. It also helps provide a stronger joint with fewer chances of leakage and less pull-apart during installation. In addition to underground installation, Schedule 40 can be used in walls, floors, and ceilings under NEC Article 352.

Tap image to zoom.

Roll over image to zoom.

PVC Conduit: Schedule 40, 4 in Trade Size, 10 ft Nominal Lg

  • Item # 4EUC4
  • Mfr. Model # A52EA12
  • UNSPSC # 39121202
  • Catalog Page # 320 320
Country of Origin USA. Country of Origin is subject to change.

CANTEX Schedule 40 Conduit is engineered with PVC to resist rust and corrosion in underground applications. The belled end design helps promote easy installation and eliminates the need for special coupling. It also helps provide a stronger joint with fewer chances of leakage and less pull-apart during installation. In addition to underground installation, Schedule 40 can be used in walls, floors, and ceilings under NEC Article 352.

Technical Specs

  • Item PVC Conduit
  • Trade Size 4 in
  • Inside Diameter 3.96 in
  • Outside Diameter 4.5 in
  • Wall Thickness 0.24 in
  • Material PVC
  • Nominal Length 10 ft
  • Conduit Type Schedule 40
  • Conduit Style Conduit with Bell End
  • Overall Length 10 ft
  • Special Features Bell End
  • Standards UL 651/ NEMA TC 2

CANTEX Schedule 40 Conduit is engineered with PVC to resist rust and corrosion in underground applications. The belled end design helps promote easy installation and eliminates the need for special coupling. It also helps provide a stronger joint with fewer chances of leakage and less pull-apart during installation. In addition to underground installation, Schedule 40 can be used in walls, floors, and ceilings under NEC Article 352.

Back to Top